The Drapers’ Hall London

Works included erection of access scaffolding to the courtyard, overcoming restricted loading capacity & access issues ensuring no damage to the building or it’s contents, which included assorted oil paintings, sculptures & antiques.

The ornate Portland stone facades were cleaned using a combination of Doff & JOS Vortech methods, coupled by careful poultice application to the ornate mouldings to remove heavy staining caused by historic water leaching. Stone repairs including replacement Portland stone cills and mouldings, indent repairs, repointing & intricate repairs to ornate mouldings were carried out. All repair & pointing mixes were expertly gauged to match existing & approved by the client following the provision of samples for inspection.

Other works included leadwork & insitu repair & varnishing of hardwood windows to achieve a high gloss finish. During the project noise levels were monitored, controlled & documented to ensure minimal disruption to building occupants. Our works were completed ahead of programme, on budget & to the client’s delight.


Key Facts

LOCATION

London

DURATION

17 Weeks

CLIENT

The Worshipful Company of Drapers

COMPLETION DATE

Sept 2019

PRINCIPAL CONTRACTOR

Restore London Ltd

VALUE

Phase 1 & 2 £213k



“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects

“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”


Steve Baldock

Divisional Director, Curo Construction

“I have used Restore London for a number of projects & find them very reliable & cost effective, with excellent workmanship – which is particularly important when working on a number of the Listed buildings we have here at RHC.”


Stephen Crampton

Project Manager, CBRE

““Restore London made our specified repairs so that they are almost invisible when viewing the room as a whole but are sufficiently different that an educated viewer could see where the mosaic had experienced areas of change when looking in detail. Perfect!” ”


Liz Smith

Chairperson & Regional Partner, Purcell

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell

“Restore London cleaned and restored the facades of the building including the courtyard all to the complete satisfaction of our Client’s team. The quality of work was matched by the professional and pro-active approach of the entire Restore team, we would certainly recommend them.”


Brian Hutchison

Board Director, BECK

Browser Update Required

This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.

Update to Google Chrome Update to Internet Edge