7 Bedford Row

Restore London have received huge plaudits for their DDA access solution Project at 7 Bedford Row which is a testament to what can be achieved when practicality meets aesthetics. Our team deconstructed the existing entrance structure to form a new aperture to house a powered disabled access solution.

Working closely with our in-house Technical Services Manager and specialist sub-contractor Sesame Access Systems, we installed the completely new lift system. After successfully managing the interfaces between the M&E design, fire system, CCTV and the existing listed building fabrics, the entrance/lift was reclad with new, matching mosaics & Carrara marble. Finally French polishing & redecorations were carried out all to the Client’s delight.


Key Facts

LOCATION

London

DURATION

12 Weeks

CLIENT

7BR Chambers

COMPLETION DATE

Dec 2021

PRINCIPAL CONTRACTOR

Restore London

VALUE

£170K



“We found Restore London to be thorough, entirely professional, transparent, and well versed in carrying out architecturally sensitive projects. The project was delivered on time and on budget, with outstanding levels of workmanship ”


Harry Charlton

Chief Executive - 7BR

“I have used Restore London for a number of projects & find them very reliable & cost effective, with excellent workmanship – which is particularly important when working on a number of the Listed buildings we have here at RHC.”


Stephen Crampton

Project Manager, CBRE

“Restore London have been invaluable throughout the project, particularly during the design phase, ensuring the new and reclaimed Portland stone and the new pre-cast was built efficiently and seamlessly.”


Jon Clayden MCIOB

Senior Project Manager, ISG PLC, Dixon House

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell

“Restore London cleaned and restored the facades of the building including the courtyard all to the complete satisfaction of our Client’s team. The quality of work was matched by the professional and pro-active approach of the entire Restore team, we would certainly recommend them.”


Brian Hutchison

Board Director, Beck Interiors