Working alongside Wates Construction & ORMS Architects, Restore London limited initially provided samples & technical solutions for the required internal finishes. The brief was to refurbish and clean/strip/repair the existing concrete structure internally to leave the original office spaces as a fresh contemporary backdrop. ORMS design took the former ancillary spaces (parking, back of house etc.) & transformed them into dynamic, informal, flexible and collaborative office spaces.

Our internal refurbishment works commenced with the erection of sequential demarcation zones for our wet abrasive works to continue through all floors unabated (and with minimal impact on other trades). After this clean was completed, we carried out concrete repairs & finally applied a clear sealant to all the concrete surfaces.

Once cured we thoroughly inspected, signed off & protected all columns & vulnerable edges through to PC. Works were completed to the satisfaction of the Client team – on time.

Due to Restore London’s specialist versatility and experience we also successfully undertook the design, fabrication & installation of the bespoke pre-cast column cladding to the external facades form ground level to first floor. The resultant high-quality pre-cast stone installation drew unanimous plaudits from all stakeholders.


Key Facts

LOCATION

London

DURATION

28 Weeks

CLIENT

JV

COMPLETION DATE

30.01.18

PRINCIPAL CONTRACTOR

Wates Ltd

VALUE

£450 K



“Working with the Restore London team on this exceptional renovation project has been a delight. From the quality of the workmanship produced, to the expert advice and liaison with the professional team to the project management & site teams assigned, we couldn’t fault them from start to finish.”


Nick Hoy

Project Director, ITC

“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”


Steve Baldock

Divisional Director, Curo Construction

“I have used Restore London for a number of projects & find them very reliable & cost effective, with excellent workmanship – which is particularly important when working on a number of the Listed buildings we have here at RHC.”


Stephen Crampton

Project Manager, CBRE

“Restore London have been invaluable throughout the project, particularly during the design phase, ensuring the new and reclaimed Portland stone and the new pre-cast was built efficiently and seamlessly.”


Jon Clayden MCIOB

Senior Project Manager, ISG PLC, Dixon House

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell

“Restore London cleaned and restored the facades of the building including the courtyard all to the complete satisfaction of our Client’s team. The quality of work was matched by the professional and pro-active approach of the entire Restore team, we would certainly recommend them.”


Brian Hutchison

Board Director, BECK

Browser Update Required

This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.

Update to Google Chrome Update to Internet Edge
error: Alert: Content is protected !!