Completed in December 2019, Restore London works included the installation of new retractable fabric awnings on noted elevations and extensive replacement of Terracotta blocks on the Brompton Road elevation. Adaption and modification of the existing structure and existing mechanical, electrical and public health services to allow new awning installation and terracotta remedial works.

Restore London worked with specialist contractors and design teams to develop designs to allow fabrication and installation of the new awnings (CPD). The project required fully designed scaffold to be installed to the full extent of the Brompton Road elevation of Harrods.  These temporary works were hoarded / concealed with a banner so that no element of the scaffold was visible during store trading hours.


Key Facts

LOCATION

Knightsbridge

DURATION

40 Weeks

CLIENT

Harrods Ltd

COMPLETION DATE

Dec 2019

PRINCIPAL CONTRACTOR

Restore London Ltd

VALUE

£2.4M



““Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project.” ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects

“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”


Steve Baldock

Divisional Director, Curo Construction

“I have used Restore London for a number of projects & find them very reliable & cost effective, with excellent workmanship – which is particularly important when working on a number of the Listed buildings we have here at RHC.”


Stephen Crampton

Project Manager, CBRE

““Restore London made our specified repairs so that they are almost invisible when viewing the room as a whole but are sufficiently different that an educated viewer could see where the mosaic had experienced areas of change when looking in detail. Perfect!” ”


Liz Smith

Chairperson & Regional Partner, Purcell

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell

“Restore London cleaned and restored the facades of the building including the courtyard all to the complete satisfaction of our Client’s team. The quality of work was matched by the professional and pro-active approach of the entire Restore team, we would certainly recommend them.”


Brian Hutchison

Board Director, BECK

Browser Update Required

This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.

Update to Google Chrome Update to Internet Edge
error: Alert: Content is protected !!