Restore London were engaged to assess, survey and provide roof drainage improvement works to eliminate ongoing rainwater ingress issues. In addition, our team redecorated the front and rear elevation masonry finishes whilst the building was fully operational. The works required installation of a fixed safe access scaffold to both elevations, followed by cleaning and decorating the external masonry surfaces. The front and rear roof gutter linings where replaced and roof drainage improvements implemented.
Finally internal decorations and new floor coverings were completed. All works were completed to highest standard and to the complete satisfaction of the client.
LOCATION
Cannon Street, London
DURATION
8 Weeks
CLIENT
Cyril Leonard
COMPLETION DATE
April 2024
PRINCIPAL CONTRACTOR
Restore London
VALUE
£128K
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google Chrome Update to Internet Edge