This spectacular early 20th century property, arranged across 8 levels in one of London’s most affluent locations, has been carefully surveyed, overhauled and restored by the Restore London team across II phases. Our pre-contract team developed the scheme with initial focus on designing and installing the access scaffolding and once erected, structural integrity checks, asbestos removal as well as early development of the optimum specification for waterproofing. Substantial works then commenced encompassing super-heated cleaning, re-pointing, repairs and indenting to the brickwork, stonework and render to the front elevation, 3 lightwells & 24 chimney stacks. Removal of redundant fixtures, fittings and ductwork, concrete repairs, structural remedials, repairs/restoration to existing pitched roofs, leadwork, RWG’s introduction of a new waterproofing system to flat roofs, replacement of roof-lights, replacement of external metal staircases and handrails, repairs & redecoration of timber windows, glazing, replacement UPVC fascia’s new bird deterrent system and renovation works to shopfronts.
LOCATION
Knightsbridge, London
DURATION
28 Weeks
CLIENT
Colliers
COMPLETION DATE
July 2025
PRINCIPAL CONTRACTOR
Restore London
VALUE
£1.6M
Jamie Fobert CBE
Steve Baldock
Stephen Crampton
Liz Smith
Louise Priestman BA(Hons)
Brian Hutchison
This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.
Update to Google Chrome Update to Internet Edge