High Street, Kensington

Restore London successfully tendered and won the façade repair and restoration works on the High Street Kensington refurbishment Project. Our remit was predominantly to carefully salvage and piece together the removed features of this beautiful brick and stone building.

Initially Restore London’s Management team researched the existing materials and using their in-house library and records found identical matches for both the brick and stone

The retained elements were dry laid and the resultant details transposed onto a working drawing by our Stone Masons, new bricks and stones were measured and ordered as required.

Our Structural Engineer then designed and provided fixings and bracketry to ensure the structures were integrated correctly in to the new façades adequately.

Our craft team re-built the pediments, Porticos and features in line with the original façades – flawlessly matching new with old.


Key Facts

LOCATION

London, W8

DURATION

16 Weeks

CLIENT

English Rose Estates

COMPLETION DATE

May 2017

PRINCIPAL CONTRACTOR

James Taylor Construction

VALUE

£150k



“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects

“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”


Steve Baldock

Divisional Director, Curo Construction

“I have used Restore London for a number of projects & find them very reliable & cost effective, with excellent workmanship – which is particularly important when working on a number of the Listed buildings we have here at RHC.”


Stephen Crampton

Project Manager, CBRE

““Restore London made our specified repairs so that they are almost invisible when viewing the room as a whole but are sufficiently different that an educated viewer could see where the mosaic had experienced areas of change when looking in detail. Perfect!” ”


Liz Smith

Chairperson & Regional Partner, Purcell

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell

“Restore London cleaned and restored the facades of the building including the courtyard all to the complete satisfaction of our Client’s team. The quality of work was matched by the professional and pro-active approach of the entire Restore team, we would certainly recommend them.”


Brian Hutchison

Board Director, BECK

Browser Update Required

This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.

Update to Google Chrome Update to Internet Edge