Great Scotland Yard

Restore London Ltd, working alongside Galliard Homes & EPR Architects, initially provided samples & technical solutions for required external finishes. A super-heated cleaning system was used to fully clean the facades including the adjoining buildings.

The RL team repaired and replaced various types of masonry consisting of stone, brickwork and glazed terracotta ashlars. Each material was appropriately finished / jointed using a variety of pointing techniques to match including artisan tuck pointing.  Additional works included stucco, render, tinting and mineral paint matching of special bricks (which could not be sourced). Portland Stone renewal and sections of brickwork re-instatement. Finally, architectural metalwork repairs and replacements, York stone paving & steps as well as stone features. The resultant high-quality finishes are a testament to the Company’s all-round façade restoration ability.


Key Facts

LOCATION

London

DURATION

52 Weeks

CLIENT

Crown Estates

COMPLETION DATE

June 2019

PRINCIPAL CONTRACTOR

Galliard Homes

VALUE

£750K



““Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project.” ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects

“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”


Steve Baldock

Divisional Director, Curo Construction

“I have used Restore London for a number of projects & find them very reliable & cost effective, with excellent workmanship – which is particularly important when working on a number of the Listed buildings we have here at RHC.”


Stephen Crampton

Project Manager, CBRE

““Restore London made our specified repairs so that they are almost invisible when viewing the room as a whole but are sufficiently different that an educated viewer could see where the mosaic had experienced areas of change when looking in detail. Perfect!” ”


Liz Smith

Chairperson & Regional Partner, Purcell

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell

“Restore London cleaned and restored the facades of the building including the courtyard all to the complete satisfaction of our Client’s team. The quality of work was matched by the professional and pro-active approach of the entire Restore team, we would certainly recommend them.”


Brian Hutchison

Board Director, BECK

Browser Update Required

This website does not support your current version of Internet Explorer, Please download the recent version from one of the links provided.

Update to Google Chrome Update to Internet Edge
error: Alert: Content is protected !!