Balderton Street

Restore London Ltd were Principal Contractors on this unique project in the very heart of London’s Oxford Street, working in conjunction with Sir Robert McAlpine whose Adidas site was situated immediately below our works. This safety-first scheme involved various access methods, protective solutions, and a great deal of specialist abseiling. We established a very detailed condition survey of the facades & then undertook essential repairs, steel treatment & restoration to the Portland stone and rear brickwork elevations.

The building remained occupied on the upper floors throughout & using the Company’s bespoke surveying software, our onsite team meticulously mapped  out the façade in line with the previous information and guidance provided by Ramboll Engineers and Murray Birrell Chartered Surveyors. Co-operating with all stakeholders throughout, despite numerous complexities and strict restrictions that were in place, all works were completed to the satisfaction of the Employer and a truly collaborative scheme was delivered safely


Key Facts

LOCATION

West End, London

DURATION

20 Weeks

CLIENT

Grosvenor Estates

COMPLETION DATE

June 2019

PRINCIPAL CONTRACTOR

Restore London

VALUE

£300K



“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects

“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”


Steve Baldock

Divisional Director, Curo Construction

“I have used Restore London for a number of projects & find them very reliable & cost effective, with excellent workmanship – which is particularly important when working on a number of the Listed buildings we have here at RHC.”


Stephen Crampton

Project Manager, CBRE

““Restore London made our specified repairs so that they are almost invisible when viewing the room as a whole but are sufficiently different that an educated viewer could see where the mosaic had experienced areas of change when looking in detail. Perfect!” ”


Liz Smith

Chairperson & Regional Partner, Purcell

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell

“Restore London cleaned and restored the facades of the building including the courtyard all to the complete satisfaction of our Client’s team. The quality of work was matched by the professional and pro-active approach of the entire Restore team, we would certainly recommend them.”


Brian Hutchison

Board Director, BECK