St Magnus House

Engaged as Specialist Sub-Contactor, our works comprised of the specialist cleaning, repair and conservation of the existing 1970s concrete façades. The scope included detailed condition surveys, development of project-specific cleaning and repair methodologies, extensive concrete repairs and localised surface treatments. Internally, works included the repair and preparation of the existing coffered concrete ceilings, followed by decoration using a specialist (Keim) mineral paint system.

Further works included the specialist cleaning and restoration of terrazzo staircases, together with the supply and installation of new granite and careful alterations to existing granite elements.


Key Facts

LOCATION

Lower Thames Street

DURATION

60 Weeks

CLIENT

Pegasus

COMPLETION DATE

July 2026

PRINCIPAL CONTRACTOR

Mace

VALUE

£2.6M



“Restore London provided an outstanding turnkey service. Their professionalism, knowledge and ability to adapt to the tight constraints of the project were key to project success. The team delivered an outstanding final product, that will be admired for years to come. I can’t thank them enough for their exceptional delivery. ”


Jacques Mein MCIOB/MAPM

Associate Project Director, Mace

“Restore London brought a level of quality craftsmanship and skill that is rare in today’s construction market. They worked collaboratively, bringing their wealth of knowledge to every detail. Their contribution to the National Portrait Gallery can be seen wherever you look in the project. ”


Jamie Fobert CBE

Architect, Jamie Fobert Architects

“Restore London demonstrated exceptional technical expertise from the outset of the project, giving us the confidence and insight to make the right decisions for the building. Combined with their personable, proactive approach and highly experienced site management team, they were a pleasure to work with throughout. The quality of the finished work on this heritage building speaks for itself.”


Jason Smith

Client Representative, Pearl & Coutts

“Restore London made our specified repairs so that they are almost invisible when viewing the room as a whole, but are sufficiently different that an educated viewer could see where the mosaic had experienced areas of change when looking in detail. Perfect!” ”


Liz Smith

Chairperson & Regional Partner, Purcell

“It was a pleasure working with the Restore London team. They showed good team spirit coupled by a highly pro-active approach to problem solving & were able to resource the project during unforeseen circumstances, such as the funeral of the late Queen Elizabeth II. The quality of their workmanship was excellent. ”


Steve Baldock

Divisional Director, Curo Construction

“Restore London’s works were undertaken to the highest standards. The team’s attention to detail has been second to none & we would recommend Restore London to anyone seeking a strong team who can deliver.”


Louise Priestman BA(Hons)

MArch MA PGCert PPA ARB RIBA – Architect, Purcell